Location: 35-60 kilometres at the coast of Changhua County
Ownership: Cathay Life and Cathay PE (50%), Ørsted (50%)
Number of turbines: 42 turbines (14 MW each)
Overall capacity: 582.9 MW
Year of Construction: 2026
Ownership: Cathay Life and Cathay PE (50%), Ørsted (50%)
Number of turbines: 42 turbines (14 MW each)
Overall capacity: 582.9 MW
Year of Construction: 2026