Press kit


Writing a story about Ørsted?


On this page we have collected the most common Ørsted images and videos for marketing purposes. ‘Access our detailed library of brand elements, icons and graphics related to our brand on our Brand Guide.

Go to Brand Guide
Our logo
Our trademarks can only be used by Ørsted and companies that are 100% owned by Ørsted. They may not be used for marketing purposes by a third party or for the business purposes of a third party without the approval of Ørsted. Inquiries should be sent to Global Branding & Marketing.

Images


From turbines to energy storage and location maps, here you will find a selection of press images and videos to use free of charge.

Our images are available free of charge. Please make sure to credit Ørsted when you use them. If you require materials for commercial use or in different formats, get in touch with the team.

Download all footages

In May 2022, Ørsted energised two onshore substations for the Greater Changhua 1 and 2a offshore wind farms, marking a crucial step in ensuring the stable transmission of clean energy to the national grid.

Download

First Taiwan-flagged Service Operation Vessel (SOV) ‘TSS Pioneer’ was bespoken to meet the unique marine conditions of the Taiwan Strait and to ensure optimal wind farm performance and stable supply of clean energy.

Download

The 900 MW Greater Changhua 1 and 2a offshore wind farms are equipped with 111 array cables and 3 export cables.

Download

Greater Changhua 1 and 2a offshore wind farms will produce clean energy enough to power one million Taiwanese households every year.

Download

Ørsted supported local supplier Sing Da Marine Structure (SDMS) in developing the capability to manufacture offshore wind jacket foundations from scratch, meeting global quality, health, safety, and environment (QHSE) standards. (2022.08)

Download

The Greater Changhua 1 and 2a is the first large scale and far-shore offshore wind farms in Taiwan.

Download

In February 2022, Ørsted successfully energised two offshore substations for the Greater Changhua 1 and 2a offshore wind farms.

Download

Greater Changhua 1 and 2a offshore wind farms has entered the operation and maintenance phase that would last more than 30 years.

Download

The 900 MW Greater Changhua 1 and 2a are Asia-Pacific’s largest offshore wind project in operation.

Download

The jacket foundations are custom-designed to withstand the weather and seabed conditions at Taiwan Strait for Greater Changhua 1 and 2a offshore wind farms. (2022.08)

Download

There are 111 SG 8.0-167 wind turbines at the 900 MW Greater Changhua 1 and 2a offshore wind farms.

Download

Ørsted invested in Port of Taichung to upgrade the infrastructure of quayside and hinterlands for storing heavy components of the wind farms. (2021.06)

Download

Ørsted's “Taiwan Offshore Wind Farms Operations and Maintenance Hub” is the largest offshore wind operations hub in Asia-Pacific in terms of service capacity and area

Download

Ørsted collaborated with more than 200 local suppliers and sub-contractors and created more than 7,200 jobs during construction phase of Greater Changhua 1 and 2a offshore wind farms.

Download

Installation of wind turbine blades at Greater Changhua 1 and 2a offshore wind farms.

Download

Ørsted is the only offshore wind company in Taiwan that brings unparalleled operations expertise and full-scale O&M deployment of a Taiwanese operations team, customized service operation vessel and new-built facility.

Download

Ørsted cultivated local offshore wind talents pool to support long-term growth of offshore wind industry.

Download

Ørsted is committed to nurturing local offshore wind talents by providing training for operations and maintenance technicians.

Download

Looking for engaging videos?

From documentaries to video explainers, get ready to deep dive into a full green energy experience